For Designers / 23 November 2026

TK 228 Letter: Review Test Reports and Certificates

The letter's recommendations and Alfa's practical checklist for selecting protective structures.

About the Letter

Technical Committee for Standardization TK 228, Secure Storage and Security Equipment, and ANO Centre for Scientific and Technical Analysis and Forecasting (ANO CEP) issued an information letter on preventing the circulation of falsified blast-protection structures.

Details of the supplied copy: 2 November 2026, reference TK228-335/2026 / ANO CEP-001/2026. Signed by O. V. Pelipas, Chairman of TK 228 and Director of ANO CEP. The letter is addressed to operating organisations and construction companies.

It recommends checking the evidence behind a certificate: the standard edition, assigned class, participants' competence, test-report content and applicability to the supplied product.

Status: this page separates a summary of the letter from Alfa's practical recommendations. Neither the information letter nor this checklist replaces the standard, test report, project documentation or expert assessment.

Identify the Standard Edition First

The letter distinguishes documents issued for testing under GOST R 57471-2017 amendment 1 between 1 December 2019 and 31 December 2024 from those under amendment 2 from 1 January 2025.

The absence of an amendment 2 reference does not by itself invalidate an earlier document. Separately check certificate validity and status, applicability to the current project, product changes and the scope of the results.

An identical class number in different editions does not establish an identical test load. Compare pressure, TNT equivalent, distance and other parameters against the edition referenced in the documents. Consult the official Rosstandart record for GOST R 57471-2017 and its amendments.

What the Letter Highlights

  1. Confirmed class, not just a model name. Check the certificate and report conclusion for the assigned class and category. A commercial designation containing VZ or VU does not establish performance.
  2. Certification body and laboratory. Identify the assessment scheme, status and competence of the participants. Where national accreditation is claimed, verify its status and scope, including the relevant standard and methods.
  3. Complete test report. Look for specimen identification, preparation, test conditions, measured quantities, result assessment and the scope of application. The letter specifically references the report structure in clause 9.13.
  4. Measurements and blast conditions. Check instruments and verification, shock-wave parameters, charge mass or TNT equivalent, distance, attacked face and installation conditions.
  5. Applicability to the supplied structure. Review dimensions, configuration, deformation and permitted changes. A certificate for one product does not cover every door, window or gate.
  6. Application scenario. The letter cautions that a certificate alone does not establish suitability for every accidental gas- or fuel-air explosion scenario. Evidence must address the project's actual load.

Use protection-class, resistance-class and protection-category terminology from the applicable edition. Commercial wording is not a substitute for the standard's classification.

Alfa Checklist: Practical Review Sequence

1. Request the Complete Package

Obtain the certificate and all appendices, complete test report, product identification and tested-specimen drawings. Request photographs, videos and information about the certification body and laboratory, including accreditation scope where accreditation is claimed.

2. Establish That All Documents Refer to the Same Product

Compare manufacturer, model, drawings, leaf and opening sizes, glazing, frame, locking, fixings and attacked faces. Check that the certificate references the supplied report and that the proposed delivery is the documented construction.

3. Compare the Load with the Project

Do not rely on an advertised pressure value alone. Compare pressure, duration, impulse, load shape and allowable damage. For a different project load, request justification of the test results' applicability.

4. Check the Outcome and Its Recording

Compare before-and-after photographs, blast footage, damage descriptions and the report conclusion. Where a door must remain operational after loading, request footage of subsequent normal opening. Video supports the evidence but does not replace measurements or a complete report.

5. Review the Limits of Application

Request the covered sizes, configurations and permitted changes and their documentary basis. Check changes in design documentation, materials, components and manufacturer. Do not transfer performance to an enlarged or modified specimen without evidence.

6. Record the Review

Prepare a short checklist recording documents received, comparisons made, unresolved questions and the organisations providing clarification. Request missing information in writing before accepting the supply.

Checking Document Status

Check claimed national accreditation in the official Federal Accreditation Service register. Review the scope, status and dates relevant to the work, not merely the existence of an entry.

Distinguish mandatory from voluntary conformity assessment. For a voluntary certificate, identify the system's rules and the document-verification process with its operator. Absence from the mandatory-certification register does not prove forgery. Check voluntary-system registration through Rosstandart's official resources; registration alone does not validate the testing of an individual product.

An unusual form or incomplete package is a reason to investigate, not an established finding of falsification. Conclusions require document comparison, clarification from issuers and consideration of applicable requirements.

Suggested Supplier Request

Please provide the certificate with all appendices and the complete GOST R 57471-2017 test report, identifying the applied edition, assigned class and category. Include specimen identification and dimensions, installation and loading conditions, measurements, photographs, videos, assessment participants and the basis for applying the results to the proposed product. For a door, please confirm the required post-blast operability.

Using the Visual Checklist

The supplied two-page visual guide helps organise the review: issuer and document, class, test parameters, photographs and videos, and post-blast door opening. Do not treat illustrated certificates, numbers, tables or sample values as authentic documents or standard requirements. Obtain actual values from the applicable standard edition and genuine test report.

Sources and Related Materials

For preliminary technical review. This page introduces no new mandatory requirements and does not replace assessment of documents for a particular project.

Need Help Reviewing Documentation?

Compare the claimed performance with your project's requirements.

Contact Us

All Designer Materials